Estimates for Repair and Kumbhabhishekam Expenses

Dear Devotees,
Hope you might have received our previous appeal, where in is indicated the proposed Kumbhabhishekam in all the three temples of Mathur Agraharam during 2010.
An Ashtamangalya prasanam was conducted on 16th and 17th March 2009 where in variuos divine verdicts were made (1) Decrease in divinity of presiding deites in all the three temples. (2) Poojas most be performed with more devotion and dedication (3) More prayers and bhajanas must be offered in temples. (4) Divine presence of Lord Subramaniya is found in existing ‘Nagar’ Sannidhi and Prathistha of Lord Subramaniya in a seperate shrine with new idol is recomended. Shifting of existing ‘Nagar’ sannidhi has to be made to southern side as per vastusastra. (5) Various dosha pariharams has to be performed before conducting Maha Kumbhabhishekam.
By doing above, divinity of presiding deites will be increased and all devotees will be blessed.
As per the divine verdict gramajanam has decided to perform Maha Kumbhabhishekam in all the three temples in 2010. It is also proposed to perform necessary renovations in the three temples and construction of a Mandapa with room facilities for stay of non-resident ‘Mathurians’.
Estimates for various renovation works, and constructions of Mandapa, Dosha pariharam, Maha Kumbhabhisheka expenses, Reserve for pooja fund are enclosed for your kind perusal. In the estimate we have furnished details of all the matters / subjects that can be sponsored by the devotees. We fervently seek your help, guidences, co-operation and generous donations in cash, kind and physique. May the presiding deities of our Agraharam Shower their blessings on you and your family.

Secretary,

Mathur Grama Mahakumbhabhiseka Committee


Estimates

Ramarkovil

Repair expenses

1. Stone laying (Srikovil) : 10000.00
2. Srikovil wall granite fixing : 20000.00
3. Gosala Granite laying : 50000.00
4. Gosala roof repair : 250000.00
5. Gosala front wooden art work : 40000.00
6. Gosala out side plastering : 50000.00
6a. Gosala inside plastering : 40000.00
7. Chuttuvilake repairing and painting : 10000.00
8. Vathilmadam roof repair : 75000.00
9. Store repair with wall : 50000.00
10. Thadapally & Agrasala roof repair : 50000.00
11. Vathilmadam wall cement plastering : 30000.00
12. Vathilmadam floor granite laying : 70000.00
13. Varnish (stone pillars) : 10000.00
14. Stone laying in Pradakshina Veedhi : 180000.00
15. Hanuman Nada roof repair, Granite fixing
& door etc. : 100000.00
16. Compound wall repair : 60000.00
17. Door’s renovation
(i) Goshala : 40000.00
(ii) Front door : 30000.00
(iii) Vathilmadam : 5000.00
(iv) Store room : 10000.00
18. Mesh fixing (top of Pradakshina Veedhi) : 15000.00
19. Wiring plumbing & drainage exp. : 60000.00
20. Painting works : 50000.00
21. Other expenses : 45000.00
Total: 1350000.0

Kumbhabhisheka Expenses

1. Azhuvar Dakishna exp.(3 days) : 150000.00
2. Vaidika dakishna
(Vedaparayanam &Travelling) : 75000.00
3. Vaidika (Materials) inc. Abisheka items : 75000.00
4. Flower,Garlands &Niramala (perday 10000x3) : 30000.00
5. Alankaram & others : 20000.00
Total : 350000.00

Sivankovil

Repair expenses

1. Stone laying (Srikovil) : 20000.00
2. Srikovil wall granite fixing : 20000.00

3. Srikovil roof repair : 30000.00

4. Srikovil wall Cement plastering (outside) : 20000.00

5. Vathilmadam cement plastering : 30000.00

6. Stone laying in Prasakshina Veedhi : 80000.00

7. Vathilmadam pillars steel plating (4 pillars) : 40000.00

8. Vathilmadam floor granite laying : 50000.00

9. Ganapathy peedam (black stone) : 10000.00
10. Front side stone laying & repair : 20000.00

11. Electrical, Plumbing & Drainage : 30000.00

12. Painting : 50000.00
13. Chuttuvilake front side : 50000.00 14. Doors : 20000.00
നബ് :470000.ഓള്‍

Kumbhabhisheka റൈറ്റ്സ്

1. Gurukkal Dakishna (3 days) : 100000.00
2. Vaidika Dakishna(Veda parayanam&Travelling) : 75000.00
3. Vaidika (Materials) inc.Abisheka items : 60000.00
4. Flower, Garlands &Niramala (per day 8000x3) : 24000.00
5. Alankaram & others : 26000.00
285000.രേലറെദ്‌

Kavukovil
Repair വോര്‍ക്സ്‌

1. Stone laying (Srikovil) : 20000.00
2. Srikovil wall granite fixing : 15000.00
3. Roof repair : 60000.00
4. Wall cement plastering : 50000.00
5. Windows repair : 10000.00
6. Doors : 20000.00
7. Front roof repair : 25000.00
8. Wall construction : 30000.00
9. Granite laying (floor) : 25000.00
10. Chuttuvilake fixing : 50000.00
11. New Sannidhi for ‘Nagar’ with granite floor & wall : 50000.00
12. New Sannidhi for Lord Subramania : 80000.00
13. Subramania Swamy Bimbam & Peetham : 20000.00
14. North side roof(sheet) : 150000.00
15. Stone or gripped tiles laying
around the temple : 125000.00
16. Electrical, Plumbing & drainage : 50000.00
17. Store room : 25000.00
18. Painting : 25000.00
19. Other expenses : 20000.00
വിത്ത്‌ 850000.00

Kumbhabhisheka Expenses

1. Gurukkal Dakishna exp. (3 days) : 1,00,000.00
2. Vaidika Dakishna (Veda parayanam & Travelling) : 75,000.00
3. Vadika materials inc. Abisheka items : 60,000.00
4. Flower,Garlands &Niramala (perday 8000x3) : 24,000.00
5. Alankaram & others : 26,000,00
6. Murugan Prathistha exp. (Pooja related) : 25,000.00
7. Nagar Prathistha exp. (Pooja related) : 15,000.00
അബോവേ : 3,25,000.00

General Expenses
Construction & repair

1. New Mandapam (3000sft) : 1500000.00
2. Therupura repair : 25000.00
3. Althara repair : 30000.00
4. Grama wells & Temple wells repair (total 8 nos) : 100000.00
5. Kulam repair : 300000.00
6. Utsava Vahanam & Pallakku : 75000.00
7. Ratham repair : 50000.00
ആരെ : 2080000.00

Kumbhabhisheka വെസ്റെദ്‌

1. Saptaham : 75000.00
2. Dasa darsanam : 15000.00
3. Ashthabandam (inc. butter) 3 temples : 15000.00
4. Prayaschittam : 125000.00
5. Special programmes 7 days : 75000.00
6. Panthal, light, sound, stage, vessels, Decoration : 200000.00
7. Elepahant, Chamayam, Panchavadhyam,
8. Thayambaka & Nadhaswaram : 35000.00
9. Catering expenses inc materials (20 days) : 350000.00
10. Vastram (for Pooja and Ritwiks etc.) : 52500.00
11. Other expenses:-
Travelling, Printing, Stationary ,Postage,
Banners & Boards,Cooli & Miscellaneous
expenditure : 347500.00
ഇന്‍ : 1290000.00

Reserve for Nithya Pooja

Ramarkovil : 1000000.00
Devikovil : 1000000.00
Sivankovil : 1000000.00
Total : 3000000.00

NB:
1. all rights related with above works are vested in Mahakumbhabhisheka Copmmittee.
2. The above works are subject to availability of sponsors